what buyer should do before install laser tracking automatic welding machine
what buyer should do before install laser tracking automatic welding machine
1. The equipment installation site is ready, 2 sets of workpiece running trolleys are completed, and the rails are laid according to technical requirements.
2. The personnel involved in the installation and commissioning of the purchaser are in place.
3. All water, electricity, gas, gas, oil and other energy sources should be connected in place and provided to the corresponding switch of the special machine manufactured by the supplier.
4. According to the installation foundation drawings provided by the supplier, the foundation should be installed in advance, and the completed installation foundation must meet the installation requirements of the supplier equipment.
5. The buyer is responsible for the installation of equipment and equipment-related accessories, and the installation of equipment and equipment-related accessories meets the requirements for the operation of the supplier equipment. The supplier provides guidance for the installation of the equipment.
6. The buyer is ready to commission 3 pieces (sets) or more.
7. The buyer shall provide convenience for the supplier during the installation, commissioning and maintenance of the equipment.